Full Bathroom renovation, starting with a full strip out, re driline all walls with a moisture resistant plasterboard and skim, a marble effect PVC wall board was used on this project with a chrome trim to finish it off, all new Quickstep flooring, vanity unit, sink and toilet, and to finish off a PVC ceiling.